      Remote areas without grid access still need power for many purposes: monitoring and telecom posts, work camps, communities and industrial sites that run around the clock, and increasingly the charging of electric vehicles and machinery. Each application calls for a different configuration of solar, storage and generator sets. MPMC, a Shanghai-based manufacturer with products in more than 120 countries and territories, has delivered off-grid power in Africa, Asia, Oceania and the Americas and supplies a configuration for each application.

      Four Applications

      Monitoring Posts and Small Facilities

      Small loads far from service centres suit all-in-one hybrid stations. GSB stations of 10 kVA to 120 kVA combine a 2,375 W slide-out solar array, LFP storage and a generator set, while the GB-30 combines 62.7 kWh of LFP storage, a 30 kVA hybrid inverter and a 24 kW / 30 kVA prime-rated generator set in one unit. Up to four GSB units fit in a 20-foot container for delivery to distant sites.

      Work Camps and Offices

      Camps need steady power for accommodation, kitchens and offices. GSB stations supply monitoring systems, temporary offices and residential camps on mining sites, where slide-out PV, high mobility and smart EMS control make them the preferred choice, and HBD-R storage paired with generator sets covers larger camp loads. In Australia, 245 GSB hybrid stations provide mobile lighting, diesel and battery power for containerised offices and water pumps across a 14.7 MW mining project.

      Long-Running Off-Grid Power Stations

      Communities and industrial sites that run continuously rely on containerised generator sets in parallel, increasingly with storage and solar. MPMC’s off-grid stations include 4 MW in Kenya on Cummins KTA50-G3 engines with Stamford S6L1D-G4 alternators, 3.9 MW of 650 kVA units in Kenya, a 1.2 MW plant in Chad on Cummins KTA50-GS8 engines with Leroy-Somer LSA50.2 L8 alternators and a 21.6 MW island power station in Indonesia running on biodiesel. Parallel operation with intelligent load sharing provides N+X redundancy, master-standby rotation and black-start capability.

      Charging Without a Grid

      BCH mobile BESS chargers bring DC fast charging to places with no grid connection, recharging from generator sets, battery storage or solar, as on MPMC’s 2 MWh off-grid construction machinery charging project in Norway, and every unit reaches full operation within 24 hours of arrival.

      Table 1. Remote applications and MPMC configurations

      Application

      MPMC configuration

      Reference

      Monitoring and small facilities

      GSB or GB all-in-one hybrid stations

      GB-30: 62.7 kWh + 30 kVA inverter + 30 kVA genset

      Work camps and offices

      GSB stations; HBD-R with generator sets

      245 GSB units on Australian mine sites

      Long-running stations

      Containerised gensets in parallel; PV and HBD-A storage

      Kenya 4 MW and 3.9 MW; Chad 1.2 MW

      Charging without a grid

      BCH chargers with genset, BESS or solar input

      Norway 2 MWh machinery charging

      MPMC containerised Cummins generator sets at the 3.9 MW off-grid power project in Kenya.

      Hybrid Microgrids for Communities

      Where demand is large enough, a microgrid combines all three sources. Each of MPMC’s four Kenyan sites pairs 1 MW of PV and at least 1 MWh of DC-coupled storage with 2 x 500 kW plus 2 x 250 kW diesel generator sets, delivering stable 24/7 power in a high-UV, sandy environment with zero corrosion, seamless solar-diesel switching and minimal on-site manpower. MPMC’s SCADA, with Starlink satellite backup, lets engineers monitor remote sites from anywhere.

      Table 2. MPMC off-grid power references

      Project

      Capacity

      Configuration

      Island power station, Indonesia

      21.6 MW

      Cummins KTA50-GS8 + Leroy-Somer LSA50.2 L8; biodiesel

      Off-grid long-running power station, Kenya

      4 MW

      Cummins KTA50-G3 + Stamford S6L1D-G4

      Off-grid power projects, Kenya

      3.9 MW

      6 × 650 kVA; Cummins KT38-GA + Stamford S5L1D-F4

      Remote-area hybrid microgrid, Kenya

      4 sites

      PV + DC-coupled BESS + diesel generator sets per site

      Off-grid small power plant, Chad

      1.2 MW

      Cummins KTA50-GS8 + Leroy-Somer LSA50.2 L8

      Mining camp power station, Côte d’Ivoire

      1.2 MW

      Cummins KTA50-GS8 + Stamford S7L1D-C41

      MPMC hybrid energy micro power station combining storage and a generator set.

      Built for Remote Conditions

      Copper radiators rated for 50°C ambient, altitude derating calculated for each engine, C3 to C5 anti-corrosion coating and built-in fuel tanks of 6 to 24 hours prepare generator sets for remote duty, and every unit is load-tested from 0% to 110% before shipment so it arrives ready to run.

      Powering a Remote Site With MPMC

      • Define the application and daily load profile

      • Assess sunshine, climate and access for fuel

      • Choose all-in-one, modular or microgrid configuration

      • Plan remote monitoring and service support

      • Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a remote power proposal

      https://www.mpmc-group.com/
      MPMC Powertech Corp.

    Viewing 1 post (of 1 total)